Project Value:
$135,548

Project Highlights:
To provide dust suppression, the work area was enclosed in reinforced polyurethane


Download Project PDF

North Billerica Foundation Modifications - North Billerica, MA

The Industrial Services Group provided engineering assessment and construction services for the installation of a precision welding machine at a facility in North Billerica, MA.  Industrial Services assessed the existing foundation and provided a design to support the new welding machine utilizing as much of the existing concrete foundation as possible.  Once the design was approved, the foundation was constructed inside a dust containment area so as not to affect other equipment in the same building.  The resulting foundation is 36" thick and 10' x 15' with 30 1" posts to support the new welding machine.

How Can We Help?

Tell us about your project and we'll provide you with a custom solution to fit your needs and budget.

Maybe later.
How can we help?