Project Highlights:
A Crest Gate was fabricated and installed on the dam for flood control


Download Project PDF

Attleboro Reservoir Dam & Pump Station Rehab - Attleboro, MA

This project at the Luther Reservoir Dam and pumping station in Attleboro, MA  consists of the rehabilitation of the existing dam including sitework, bascule and crest gate installation.  Additionally, the project includes the rehabilitation of the existing pumping station and the replacement of pumps, motor starters, and electrical panels. Methuen Industrial Services is also installing an outside generator with an autotransfer switch, plus associated gas piping and electrical work.