Experience

Project Info:
Owner:
Schnitzer Steel Industries

Technologies/Materials:
Steel framed enclosures and equipment installations

Engineer:
Waldron Engineering

Project Value:
$8.0 Million

Project Highlights:
The project supports the new emissions control system at the steel recycling facility


Download Project PDF

Everett Emissions Control Equipment Support - Everett, MA

A new emissions control system is being installed at the Schnitzer Steel Industries scrap metal shredding facility in Everett, MA. Methuen Construction is providng the labor, materials, equipment, tools and supplies to install steel framed enclosures, support structures, procured equipment and assoicated architectuaral, mechanical, and electrical work in support of the shredder emissions control project. 

How Can We Help?

Tell us about your project and we'll provide you with a custom solution to fit your needs and budget.

Maybe later.
How can we help?