Experience

Project Info:
Owner:
Washington Mills - SMG Management

Technology:
Primed and painted steel beams and plates

Architect:
TEC, Inc.

Project Value:
$451,275

Project Highlights:
The project repaired, renovated, and painted the Mill Street bridge in Lawrence, MA.


Download Project PDF

Lawrence, MA - Bridge Repair & Painting

The project invloved the fabrication, installation and painting of bridge components:

  • 2 primed steel channels in the NE corner of the bridge.
  • 7 steel beams at the south abutment of the bridge
  • Steel plate replacements over floor beams in four locations of the bridge
  • 6 PVC down spouts under the bridge drains

Additionally, a six foot section of the bridge railing was straighted. welded, and repaired.