Project Info:
Owner:
Town of Wayland

Technology:
Membrane Filtration System

Engineer:
Tata & Howard

Project Value:
$8 Million

Project Highlights:
This project was done without impacting the fragile Baldwin Pond ecosystem.


Download Project PDF

Wayland, MA - Membrane Ultra Filtration

Methuen Construction was the General Contractor for this project to construct a 1.5 million gallon per day Water Treatment Facility utilizing Membrane Ultra Filtration to remove iron and manganese from the Wayland drinking water supply. Work included construction of a new Masonry building above concrete holding tanks, replacement of existing well pumps, Ozone Generation, Compressed Air, Membrane Filtration, Chemical Feed, and SCADA systems.