Experience

Project Info:
Owner:
New England Confectionery Company (NECCO)

Technologies/Materials:
Installation of Mechanical Process & Kitchen Production Systems

Engineer:
The Austin Company

Project Value:
$9.6 Million

Project Highlights:
More than 90,000 linear feet of piping was installed during this project.


Download Project PDF

Revere Gas Fired Turbine Installation - Revere, MA

Methuen Construction was the Mechanical Contractor for this project that built a new gas-fired turbine cogeneration facility at the NECCO candy factory in Revere, MA.  Construction included the rigging and setting of two 60,000 pound turbine generators, associated pressure vessels, selective catalytic reduction units, heat recovery steam generators, a 600 horsepower (HP) steam generator, cooling towers, heat exchangers, and 90,000 linear feet of carbon and stainless steel piping.