Project Info:
Owner:
City of Fitchburg, MA

Technologies/Materials:
Water Treatment - Direct Filtration of River Water

Engineer:
Earth Tech

Project Value:
$12.5 Million

Project Highlights:
A gravity flow system built into the sloping site reduces the need for secondary pumping


Download Project PDF

Fitchburg Filtration of River Water - Fitchburg, MA

Methuen Construction was the General Contractor for the construction of a water treatment facility that allows direct filtration of river water for the Fitchburg regional water district. Methuen Construction self-performed most of the work including: site work, excavation, concrete, yard piping, process piping, civil, lagoons, buildings, equipment installation, and coordination of plant start-up.  The filtration facility is built into a sloping site, which allows the use of a gravity flow system that reduces the need for secondary pumping.  Treated water is discharged into a two-zone, 2-million gallon storage tank, and then into an adjoining 36-inch diameter water transmission main that serves the regional water district.

How Can We Help?

Tell us about your project and we'll provide you with a custom solution to fit your needs and budget.

Maybe later.
How can we help?