Experience

Project Info:
Owner:
Enel Green Power North America Inc.

Technologies/Materials:
Fabricated and installed hydro-dam trashrackss

Engineer:
The Turner Group

Project Value:
$1 Million

Project Highlights:
Twelve large trashracks were fabricated and then installed in a 70-foot-deep cofferdam


Download Project PDF

Lawrence Cofferdam Repair & Replacement - Lawrence, MA

Methuen Construction not only created 12 large trashracks to replace old damaged ones at the Enel Green Power hydroelectric dam, but had the capabilities to install them in a 70 foot deep cofferdam. The new trashracks were fabricated at the fabrication shop, and then carefully reinstalled in the renovated cofferdam. Additionally, the existing sidewall concrete of the cofferdam was modified, which was necessary for the completion of the project. Since the work was performed in a narrow 70 foot deep cofferdam, additional OSHA safety measures were implemented.

 

How Can We Help?

Tell us about your project and we'll provide you with a custom solution to fit your needs and budget.

Maybe later.
How can we help?