Experience
Project Info:
Owner:
Massachusetts Port Authority - Massport
Technology:
Stainless Steel & Miscellaneous Metals
Engineer:
Fay, Spofford & Thorndike
Project Value:
$725,000
Project Highlights:
This was a fast-paced project with a schedule that required keeping one melter online at all times
Owner:
Massachusetts Port Authority - Massport
Technology:
Stainless Steel & Miscellaneous Metals
Engineer:
Fay, Spofford & Thorndike
Project Value:
$725,000
Project Highlights:
This was a fast-paced project with a schedule that required keeping one melter online at all times
Logan Airport - Parking Lot Ice Melters
The project required shop pre-fabrication of panels and other components to replace the walls of four ice melter cauldrons at Logan airport. The cauldrons measure 18’ x 5’x 15’ high with radius ends. Additionally, the stainless steel pipe and pipe headers were all replaced. This was a fast paced project with a schedule that required that at least one ice melter was online at all times.