“As a result of Methuen’s cooperative effort with Biothane,
the owner is now operating a state-of-the-art wastewater treatment
and energy recovery system.”
Brad Smith, Project Manager, Biothane Corporation |
|
 |
|
|
| Back to Projects |
 |
| |
ALTERNATIVE ENERGY
Anheuser-Busch
Biothane Anerobic Digestion
Methuen Construction self-performed all site work, excavation, concrete, equipment installation and piping for this $3.3 million Biothane Bio-Energy Recovery System (BERS) at Anheuser-Busch’s Merrimack, NH brewery. The BERS system collects the brewery wastewater to produce a methane-rich biogas to fuel the brewery’s boilers.
|
|
 |
|
|
|