Experience

Project Info:
Owner:
Greater Lawrence Sanitary District

Technologies/Materials:
2500 feet of Hobas Pipe, 87 feet of 72 inch steel pipe

Engineer:
Kleinfelder/SEA Consultants, Inc.

Project Value:
$11 Million

Project Highlights:
Excavated/Installed 2500’ of 72” Hobas pipe, fabricated and installed 87’ of steel pipe inside/outside pump station.


Download Project PDF

North Andover Force Main Replacement - North Andover, MA

The project consisted of Modifications to the Riverside Pump Station and installation of 2500’ of 72" Force Main Hobas Pipe. A major issue to be addressed was a significant conflict between the specified location of the Force Main and existing Utilities. Methuen performed intensive redesign, survey and exploratory excavation work to determine a location where the force main could be safely installed. This redesign work was done within a two-week period. Additionally, 87 feet of 72 inch epoxy coated steel pipe was fabricated and installed both inside and outside of the Pump Station. 

How Can We Help?

Tell us about your project and we'll provide you with a custom solution to fit your needs and budget.

Maybe later.
How can we help?