Experience

Project Info:
Owner:
Spincraft, North Billerica, MA

Technologies/Materials:
Concrete Slab Placement, Asbestos Removal

Architect:
Terracon Consulting

Engineer:
EnviroVantage (Asbestos Removal)

Project Value:
$3.2 Million

Project Highlights:
The discovery of asbestos contaminated soil, required the development of a comprehensive removal plan


Download Project PDF

North Billerica Asbestos Removal - North Billerica, MA

Methuen Construction was the general contractor for this project at Spincraft in North Billerica, MA.  Initial scope was preparing an existing area to support a Carnaghi Vertical Turning Center, which Spincraft uses to create complex metal fabrications for the aerospace, defense, and energy industries. Work consisted of: demolition of a concrete floor slab, dewatering and excavation with engineered support in order to form and place a concrete foundation measuring 60’x55’ inside an existing facility. Prior to starting construction, the soil was found to be contaminated with asbestos, which required the project team to develop a comphrensive plan to address the asbestos contamination.

How Can We Help?

Tell us about your project and we'll provide you with a custom solution to fit your needs and budget.

Maybe later.
How can we help?